Question 7 (Building Automation Systems)

What type of facility requires a building automation system (BAS) device to be located every 5 sq m (50 sq ft)?

Select an option, then click Submit answer.

  • ○

    Hotel guest room

  • ○

    Education classroom

  • ○

    Hospital

  • ○

    Mechanical room

  • ○

    Factory

Question 8 (Bonding and Grounding (Earthing))

As a guide, the recommended maximum AC current value on any bonding conductor should be less than ________ amperes.

Select an option, then click Submit answer.

  • ○

    0.50

  • ○

    1

  • ○

    5

  • ○

    10

  • ○

    20

Question 9 (Special Design Considerations)

Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

Select an option, then click Submit answer.

  • ○

    Isolating transformers

  • ○

    Neutralizing transformers

  • ○

    Mutual drainage reactors

  • ○

    Unit-type neutralizing transformers

  • ○

    2-winding neutralizing transformers