Question 1
(Topic 1)
When a control is found to be ineffective, which of the following steps should be taken next? Reveal Solution Hide Solution Discussion Correct Answer: B π³οΈ
Select an option, then click Submit answer.
- β Risks should be re-assessed to determine if there is the appropriate level of control assessment.
- β An action plan should be designed to close the gap.
- β The controls should be re-assessed during the next cycle to determine if they are still ineffective.
- β Risks should be re-assessed to determine if there can be an exception for the level of control assessment.